BuiltWorlds AI Top 50, 2026: Kaya recognized for AI-native procurement in construction.→ See why

Built for hyperscale

data centers.

Kaya keeps data center projects on track across every vendor, milestone, and delivery.

Built by and for Industry Leaders

Construction workers reviewing plans on site

Keep every critical path moving.

Coordinate long-lead equipment, vendors, and construction execution in one platform.

Construction workers reviewing plans on site

Keep every critical path moving.

Coordinate long-lead equipment, vendors, and construction execution in one platform.

Construction workers reviewing plans on site

Keep every critical path moving.

Coordinate long-lead equipment, vendors, and construction execution in one platform.

Electrical switchgear in an equipment room

Long-lead visibility

Track switchgear, generators, transformers, and cooling equipment from procurement through delivery.

Electrical switchgear in an equipment room

Long-lead visibility

Track switchgear, generators, transformers, and cooling equipment from procurement through delivery.

Electrical switchgear in an equipment room

Long-lead visibility

Track switchgear, generators, transformers, and cooling equipment from procurement through delivery.

Aerial view of a logistics site with connected delivery routes

AI-powered vendor coordination

Amber follows up on vendors, tracks lead times, and keeps procurement moving.

Aerial view of a logistics site with connected delivery routes

AI-powered vendor coordination

Amber follows up on vendors, tracks lead times, and keeps procurement moving.

Aerial view of a logistics site with connected delivery routes

AI-powered vendor coordination

Amber follows up on vendors, tracks lead times, and keeps procurement moving.

Faster and smarter execution from procurement to closeout.

Faster and smarter execution from procurement to closeout.

0x

faster RFP creation

0x

higher probability of winning

~0+

additional wins per month

>80%

fewer manual comparisons

Case Studies

Case Studies

  • Hospital campus buildings

    Scaling project execution across 10+ projects.

    Suffolk scaled Kaya from an initial pilot to more than 10 active projects, giving teams real-time visibility into vendors, procurement, and critical project milestones across complex commercial builds.

    Suffolk logo
  • Modern hospital building

    Turner eliminated manual coordination to achieve 100% visibility and identify delivery risks 2–4 weeks earlier.

    Turner cut manual delivery follow-ups by 50%+ and flags delivery risks 2–4 weeks earlier.

  • Hospital campus buildings

    Scaling project execution across 10+ projects.

    Suffolk scaled Kaya from an initial pilot to more than 10 active projects, giving teams real-time visibility into vendors, procurement, and critical project milestones across complex commercial builds.

    Suffolk logo
  • Modern hospital building

    Turner eliminated manual coordination to achieve 100% visibility and identify delivery risks 2–4 weeks earlier.

    Turner cut manual delivery follow-ups by 50%+ and flags delivery risks 2–4 weeks earlier.

Deliver data center projects on schedule.

© 2026 Kaya AI. All rights reserved.

   "C_pDiDyyY7Hos": { "on": "visible", "vars": { "event_name": "conversion", "send_to": ["AW-16831319329/zyxOCPuNurwaEKGa5tk-"] } }