Schedule a briefing →
See the platform
$300M+
Equipment procured
25+
Years mission-critical
$1.4B+
In project value
AS
Live
wks
62
54
38
26
18
"You're not behind on construction. You're behind on procurement. Pair real-world execution with AI-driven intelligence and you get something the industry has never had: certainty."
— Kaya Procurement Intelligence
The cost of waiting
Every week you wait on switchgear, generators, or cooling units, compute revenue walks out the door. Move the sliders.
Cost of delay calculator
Cost per day
$1,520,000
30-day loss
$45.6M
Cumulative revenue loss over 30 days
What we bring together
Most platforms hand you a dashboard and wish you luck. Kaya is vertically integrated — technology, team, and AI run as a single accountable operation.
⚡
Software
Our proprietary Price, Availability, Lead Time & Substitutions engine surfaces real-time market signals — not stale quotes. The Mission-Critical Lead Time Index tracks equipment lead times across transformers, switchgear, and generators nationwide.
🛡
Services
A dedicated procurement team led by deep MEP expertise on generators, MV switchgear, substations, chillers, and turbines. We know how equipment is built, how OEMs operate, and where delays actually come from.
✦
AI Layer
From automated RFP discovery to owner-furnished equipment tracking, Amber operates on top of the expertise — accelerating bid cycles, flagging risk, and holding institutional memory across your entire portfolio.
The engagement model
The platform and the team operate together across the project lifecycle — from early equipment strategy through factory coordination, logistics, and turnover.
01
02
03
04
Select project history
Executed across data centers, pharmaceutical campuses, semiconductor fabs, and research institutions — $1.4B+ in total project value.
Amgen
Pharma manufacturing campus — upstream/downstream production, vial fill finish, packaging, and mission-critical utility infrastructure.
$600M
800,000 SF
Genzyme
Gas turbine generators, steam generation, substations, switchgear, chillers, cooling towers, boilers, and electrical distribution.
$200M
140,000 SF
Evergreen Solar
Solar panel manufacturing — major MEP infrastructure, steam generation, cooling systems, VOC abatement, and industrial utilities.
$250M
600,000 SF
MIT
Brain & Cognitive Science Center
Substations, generators, chillers, cooling towers, steam systems, and specialized vivarium and lab research infrastructure.
$180M
350,000 SF
LEED Silver certified, N+1 / 2N redundancy, scalable mission-critical power and cooling infrastructure.
$150M
330,000 SF
Intel
C4 Sort & Fab 17 Facility
Semiconductor cleanroom and manufacturing infrastructure — ISO environments, process systems, and utility distribution.
$100M
50,000 SF
Share your specs, BOMs, or drawings we scope the procurement, source verified suppliers, and track every item to site.
Schedule a briefing →
Upload your drawings

